Construction of the mechanical part of WWTP Osijek (phase II)
Osijek | Croatia
Duration: from 2/2015 to 5/2016 | Services: Preparation of the mechanical design for technology
Project objectives
The main objective of this project is preparation of mechanical design for technology for phase II of construction of WWTP Osijek – mechanical part of the WWTP with outflow into Drava river.
Project data
170.000 ES
Project specifics
Pumping station Q=6 m³/s
Building – coarse grate and septic sludge
Building – fine grates
Aerated sand trap and grease separator
Primary sedimentation tanks
Final discharge into Drava river