Croatian veteran’s home

Lipik | Croatia

Duration: from 10/2014 to 9/2015 | Services: Preparation of concept designs, main designs and detailed designs for MEP

Project objectives

The main objective is to prepare designs for all installations (HVAC, gas, water and sewage and electrical installations) on the level of concept design, main design and detailed design. The existing public building should be repurposed and expanded to serve as a hotel with additional contents.

Project data

Net building area: 2.432 m²
Boiler room: 2x 91 kW (gas condensing boiler)
Heat pump: heating output 133 kW, cooling output 125 kW

Project specifics

Heating with a combination of gas condensing boiler and heat pump
High energy efficiency of the building

Photos: iC Arhiva, Croatian veteran’s home Lipik