High-bay warehouse Podravka
Koprivnica | Croatia
Duration: from 3/2015 to 8/2015 | Services: Preparation of mechanical designs, main and detailed designs
Project objectives
The existing heating and cooling system is intended to be replaced with a new system which will use the energy from the central boiler room. The project will be implemented with the aim to maintain the desired temperatures in the building, as well as modernization of the system.
Project data
Caloriffers connected to the central boiler room for heating
Chiller for cooling
Project specifics
Heating and cooling of a high-bay warehouse
Photos: iC Arhiva
Do you need the design of mechanical installations?
Do you need plumbing and drainage design?
Do you need electrical installation design?
Contact us!