Duration: from 4/2016 to 6/2017 | Services: Preparation of concept designs, main designs and detailed designs for MEP
Project objectives
The main objective is to prepare designs for all installations (HVAC, gas, water and sewage and electrical installations) on the level of concept design, main design and detailed design for a new hotel in Varaždinske Toplice. All buildings are planned in such a way so that they meet high energy efficiency criteria and use renewable energy sources for heating and cooling as much as possible.
Project data
Net building area: 4.840 m²
Boiler room: 2×300 kW biomass boiler (wood chips)
Cooling: Heat pump with cooling output 353 kW
Project specifics
High energy efficiency standards
Smart rooms
Maximization of usage of renewable energy sources