Duration: from 6/2014 to 11/2015 | Services: Preparation of concept designs, main designs and detailed designs for MEP
Project objectives
The main objective is to prepare designs for installations (HVAC, gas, water and sewage and electrical installations):
• Infrastructure (concept design, main design and detailed design)
• Administration building (main design and detailed design)
• Entrance building (main design and detailed design)
• Kitchen (main design and detailed design)
• Hostel (concept design)
• Service garage (main design and detailed design)
• Infrastructure (concept design, main design and detailed design)
• Administration building (main design and detailed design)
• Entrance building (main design and detailed design)
• Kitchen (main design and detailed design)
• Hostel (concept design)
• Service garage (main design and detailed design)
Project data
Condensing boilers and multisplit devices
Project specifics
High energy efficiency level