Duration: from 9/6/2017 to 8/23/2018 | Services: Outline design and execution design.

Project objectives

The main objective is to prepare designs for all installations (HVAC, gas, water and sewage and electrical installations) on the level of
main design and detailed design for a residential and business center in Nur-Sultan Kazakhstan. The buildings are planned in such a way so that they meet high energy efficiency criteria and use renewable energy sources for heating and cooling as much as possible.

Project data

Chemical water treatment system
Net building area: 120.000 m²

Project specifics

The fulfillment of high building codes and regulations. Specific building requirements in central Asia.
The requirement to implement an chemical water treatment system

Photos: Mabetex Project Engineering