Pale District Heating – Feasibility Study
Pale | Bosnia and Herzegovina
Duration: from 10/19/2012 to 2/28/2013 | Services: Technical assistance for preparation of the Feasibility study
Project objectives
Modernisation of the district heating system in order to improve the efficiency and reliability of the district heating supply in Pale.
Project data
The district heating system in Pale contains:
1) 2 boiler units with a total capacity of 6,800 kWt
2) 3,080 meters of pipes, of which 2,180 are steel pipe lines in concrete tunnels and 900 meters are pre-insulated pipes
3) 43 individual heating substations
1) 2 boiler units with a total capacity of 6,800 kWt
2) 3,080 meters of pipes, of which 2,180 are steel pipe lines in concrete tunnels and 900 meters are pre-insulated pipes
3) 43 individual heating substations
Project specifics
Consumers awareness rising and improvement of consumers behavior with change to demand side management system.