Reconstruction and upgrade of the biomass boiler plant, Gerovo sawmill

Gerovo | Croatia

Duration: from 2006 to 2007 | Services: Electrical and mechanical design, design of the fire hydrant network

Project objectives

In order to increase capacity, it is necessary to increase the size of the energy plant with the goal to cover the energy requirements of the new production hall, new drying plant and pellet production plant, as well as auxiliary spaces. Along with that, it is necessary to foresee the possibility of connecting external heat consumers to the district heating network.

Project data

Nominal thermal power of the boiler: 6.000 kW
Heating network: 6 bar, 100/80°C

Project specifics

Big thermal power of the plant, connections for potential external consumers

Photos: iC Arhiva